diff --git a/docs/00-Current-status/current-status.md b/docs/00-Current-status/current-status.md
index 48bcf6c4cc3a43d30df0ec6f37b5adbf1e5a9d9f..aa7190a95be7139602f054c3cb5e095b2c186eed 100644
--- a/docs/00-Current-status/current-status.md
+++ b/docs/00-Current-status/current-status.md
@@ -1,29 +1,49 @@
 # Current Project Status 
 
-
-**Status sprint _?_ Date 30.9.2021**
-
 ## Gitlab Issues
 
-
 * [Current Issue Board](https://gitlab.labranet.jamk.fi/open-project-framework/opf-virtual-company-v1/core/-/boards)
 * [Issues List](https://gitlab.labranet.jamk.fi/open-project-framework/opf-virtual-company-v1/core/issues)
 
+Team should update this status report every sprint.
+
+
+
+**Status sprint _?_ Date 30.9.202X**
+
 ## What has been achieved
 
-Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna 
+* Lorem ipsum dolor sit amet, consectetur adipiscing elit
+* sed do eiusmod tempor incididunt ut labore et dolore magna 
 
-## Existing Problems
+## Do we have a problems/challenges?
 
-* [List of existing issues and / or problems]()
-* [Links to issue tickets?](), eg. #1, #10 and #9
+* Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna 
+* [Links to problematic issue tickets?](), eg. #1, #10 and #9
 
-Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna 
 
 ## Next steps
 
+* Sed do eiusmod tempor incididunt ut labore et dolore magn
 * [Link to next milestone / sprint]()
 
+**Status sprint _?_ Date 1.9.202X**
+
+## What has been achieved
+
+* Lorem ipsum dolor sit amet, consectetur adipiscing elit
+* sed do eiusmod tempor incididunt ut labore et dolore magna 
+
+## Do we have a problems/challenges?
+
+* Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna 
+* [Links to problematic issue tickets?](), eg. #1, #10 and #9
+
+
+## Next steps
+
+* Sed do eiusmod tempor incididunt ut labore et dolore magn
+* [Link to next milestone / sprint]()
 
 
 Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna